Menu

This week's roadworks - see if your journey is affected

Forty Green, Bledlow
18 September — 27 October
Delays likely Road closure
Works location: Forty Green To Outside Number 4 Forty Green
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Forty Green, Bledlow
18 September — 27 October
Delays likely Road closure
Works location: Forty Green To Outside Number 4 Forty Green
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
A4129 Risborough Road, Kingsey
18 September — 22 September
Delays possible Traffic control (two-way signals)
Works location: Foxhill Barn, Risborough Road, Kingsey, Aylesbury, Hp17 8lz
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Chinnor Hill, Chinnor
18 September — 17 November
Delays possible Traffic control (multi-way signals)
Works location: From Junction Ofhill Top Lane 3 Way Junction Odf Chinnor Hill
Works description: Working On Behalf Of Thames Water Works Methodology 450m Of D/Drill / 50m Of Opencut / 12 X Service Relays/ Connections / Disconnections Surface Location Cw Fw Verge
Responsibility for works: Thames Water
Current status: Planned work about to start
Chinnor Road, Thame
18 September — 20 October
Delays possible Traffic control (multi-way signals)
Works location: From Junction Of Red Lane (Manor Farm) To Junction Of Hill Top Lane & Chinnor Hill
Works description: Working On Behalf Of Thames Water Methodology 200m Od D/Drill / 3 X Service Relays / Connections / Disconnections Surface Locations Cw / Fw / Verge
Responsibility for works: Thames Water
Current status: Planned work about to start
Hill Top Lane, Chinnor
18 September — 20 October
Delays possible Traffic control (multi-way signals)
Works location: Junction Of Chinnor Road & Chinnir Hill
Works description: Working On Behalf Of Thames Water Works Methodology 30m Of Opencut / Connections / Disconnections Surface Location Cw / Fw / Verge
Responsibility for works: Thames Water
Current status: Planned work about to start
M40
18 September — 19 September
Delays possible Some carriageway incursion
Works location: 68/1 - 71/7 A - H/S L1 Closure. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: Nighttime - Safety Fence Repairs
Responsibility for works: Highways England
Current status: Planned work about to start
M40
18 September — 19 September
Delays possible Some carriageway incursion
Works location: J7 Entry B - J7 Entry B. Left Permanent Lane 1 Closed.
Works description: Nighttime - Safety Fence Repairs
Responsibility for works: Highways England
Current status: Planned work about to start
M40
18 September — 19 September
Delays possible Lane closure
Works location: 69/6 - 67/6 B - Hard Shoulder And Lane 1 Closure. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: Nighttime - Safety Fence Repairs
Responsibility for works: Highways England
Current status: Planned work about to start
M40
18 September — 19 September
Delays possible Some carriageway incursion
Works location: 78/0 - 74/5 B - H/S L1 Closure. Left Permanent Lane 1 Closed.Left Hard Shoulder Closed.
Works description: Nighttime - Safety Fence Repairs
Responsibility for works: Highways England
Current status: Planned work about to start
M40
18 September — 19 September
Delays possible Some carriageway incursion
Works location: J8 Entry B Ox Spur - J8 Entry B Ox Spur. Left Permanent Lane 1 Closed.
Works description: Nighttime - Safety Fence Repairs
Responsibility for works: Highways England
Current status: Planned work about to start
B4445 Thame Road, Chinnor
18 September — 22 September
Delays unlikely Some carriageway incursion
Works location: Outside Number 20
Works description: Lay New Mains And 6 New Services Nearside Footpath To Site
Responsibility for works: SGN
Current status: Planned work about to start
Banks Road, Haddenham
18 September — 20 September
Delays unlikely Traffic control (give & take)
Works location: Outside The Dentist
Works description: -
Responsibility for works: Buckinghamshire County Council
Current status: Planned work about to start
Chinnor Hill, Chinnor
19 September — 21 September
Delays unlikely Some carriageway incursion
Works location: 3 Forest Hill Kennels Chinnor Hill
Works description: Reinstate Carriageway In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Doveleat, Chinnor
18 September — 20 September
Delays unlikely Traffic control (give & take)
Works location: 5 Doveleat
Works description: Fire Hydrant Standard Repair Fway In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Fort End, Haddenham
18 September — 20 September
Delays unlikely Traffic control (give & take)
Works location: Outside Spicers Yard
Works description: -
Responsibility for works: Buckinghamshire County Council
Current status: Planned work about to start
Greenway
19 September — 21 September
Delays unlikely Some carriageway incursion
Works location: Greenway
Works description: Customer Side Leakage Supply Pipe Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Peascroft, Long Crendon
18 September — 20 September
Delays unlikely No carriageway incursion
Works location: 23
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Skittle Green, Bledlow
18 September — 27 October
Delays unlikely Traffic control (give & take)
Works location: Junction Of Holly Green Lane To Forty Green
Works description: -
Responsibility for works: Thames Water
Current status: Planned work about to start
Stoke Talmage Road, Wheatfield, Thame
19 September — 21 September
Delays unlikely Some carriageway incursion
Works location: Wheatfield Cottages
Works description: Reinstate Multiple Surfaces In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Thame Road, Haddenham
18 September — 20 September
Delays unlikely Traffic control (give & take)
Works location: On Traffic Calming Island
Works description: -
Responsibility for works: Buckinghamshire County Council
Current status: Planned work about to start
Thame Road, Haddenham
19 September — 21 September
Delays unlikely Traffic control (give & take)
Works location: Outside Browns
Works description: -
Responsibility for works: Buckinghamshire County Council
Current status: Planned work about to start
Thame Road, Haddenham
19 September — 21 September
Delays unlikely Traffic control (give & take)
Works location: Outside 15a
Works description: -
Responsibility for works: Buckinghamshire County Council
Current status: Planned work about to start

Please 'Follow' & 'Like' Thame Hub

Thame Hub Partners

banner
banner
banner
banner

Thame Hub Partners

banner
banner

Advertise with Us

banner

Upcoming Events

Aug
3
Mon
11:00 am Haddenham Park Care Home: Parkin... @ Haddeham Park Care Home
Haddenham Park Care Home: Parkin... @ Haddeham Park Care Home
Aug 3 @ 11:00 am – 12:00 pm
Haddenham Park Care Home: Parkinson's Support Group And Exercise Classs @ Haddeham Park Care Home
Join this free monthly support group for people living with Parkinson's and their caregivers. Held on the first Monday of every month from 11:00am–12:00pm, the session includes a gentle, physiotherapist-led exercise class for participants with Parkinson's, while caregivers can enjoy coffee, cake and the opportunity to connect with others in a relaxed, supportive environment. When: First Monday of every month, 11:00am–12:00pmCost: FreeWho: People living with Parkinson's and their caregivers
Aug
6
Thu
2:00 pm Family Beach Day at Haddenham Park!
Family Beach Day at Haddenham Park!
Aug 6 @ 2:00 pm – 6:00 pm
Family Beach Day at Haddenham Park!
Bringing the Seaside to Haddenham Park Location : Haddenham Park Care Home Thursday 6 August 2026 2:00pm – 6:00pm Get ready for an afternoon of seaside fun as we bring the spirit of the coast to Haddenham Park for our very own Family Beach Day! We’re inviting our residents, families, and members of the local community to join us for a fun-filled summer afternoon featuring: Live steel pan music Food Beach fun and plenty more! Come along, enjoy the atmosphere and help us create some wonderful summer memories together. Beach-themed attire is encouraged, so grab your sun hats, Hawaiian shirts and seaside accessories! __PRESENT __PRESENT
Aug
17
Mon
7:30 pm Death Cafe @ Thame Barns Centre
Death Cafe @ Thame Barns Centre
Aug 17 @ 7:30 pm – 8:30 pm
Death Cafe @ Thame Barns Centre
You are warmly invited to attend Death Cafe in Thame. at 7:30pm in room 1 of the Barns Centre, and held on the third Thursday of each month thereafter A Death Cafe is an informal gathering where people can discuss death over tea and cake. We’re aiming to normalise the topic of death, raise acceptance, and help people make the most of their lives by breaking the taboo around mortality. It is not a grief support group or counselling session. These sessions have no agenda, objectives, or themes, allowing for organic, group-directed conversations about anything related to death, from end-of-life planning to fears and feelings, fostering open sharing in a respectful, confidential space. Death Cafe is run on a not-for-profit basis but if you are able to make…

Read More...

Got a news story? Or do you want to reach out to the people of Thame?