Upcoming roadworks around Thame
| Aston Road, Haddenham, Buckinghamshire | | 26 April — 05 May | | | | Delays possible Traffic control (two-way signals) | | | Works location: From our pole mounted transformer to the new housing site near tiggwinkles center. c\w. verge. | | | | Works description: Connections Projects:NEW SERVICE: (APPROX DEPTH 450mm-600mm):installation of new LV mains to housing site | | | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | | | Current status: Planned work about to start | | | | Works reference: EC30034792208 | | |
|
|
| B4445 Park Street, Thame, Oxfordshire | | 26 April — 01 May | | | | Delays possible Traffic control (multi-way signals) | | | Works location: Thame Upper High Street | | | | Works description: Mini Planer Patching | | | | Responsibility for works: Oxfordshire | | | | Current status: Planned work about to start | | | | Works reference: KE400888879632 | | |
|
|
| Cavendish Walk, Thame, Oxfordshire | | 26 April — 01 May | | | | Delays unlikely Some carriageway incursion | | | Works location: O/S 2 | | | | Works description: Serv Pipe Relay Inc Fitting Sz P Cway in Carriageway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031068311-001 | | |
|
|
| Chinnor Road, Towersey, Thame, Oxfordshire | | 26 April — 01 May | | | | Delays unlikely Some carriageway incursion | | | Works location: THE THREE HORSESHOES | | | | Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031024497-001 | | |
|
|
| Denbigh Road, Thame, Oxfordshire | | 26 April — 01 May | | | | Delays unlikely Some carriageway incursion | | | Works location: 12 | | | | Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU358001238LLLM--000001 | | |
|
|
| Naseby Close, Thame, Oxfordshire | | 26 April — 01 May | | | | Delays unlikely Some carriageway incursion | | | Works location: O/S 3 | | | | Works description: Service Pipe Repair <33mm Fway in Footway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031068318-001 | | |
|
|
| Pearce Way, Thame, Oxfordshire | | 27 April — 02 May | | | | Delays unlikely Some carriageway incursion | | | Works location: O/S 10B | | | | Works description: Service Pipe Repair <33mm Cway in Carriageway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031067018-001 | | |
|