| A418 Aylesbury Road, Haddenham, Buckinghamshire | | 30 April — 19 May | | | | Delays likely Traffic control (multi-way signals) | | | Works location: Approx 70M from J/O Thame Road & approx 25M from J/O Thame Road to J/O Thame Road, Aylesbury Road, . f\w. c\w. | | | | Works description: Network Operations Distribution:Installation of new Low Voltage electricity cables to ensure safe and reliable power supplies:Excavation of trench & joint holes in footway & verge to enable the installation of low voltage cable. 3-way traffic signals to be in operation from 09:30 to 15:30 Monday to Saturday and are to be manned at all times. Traffic signals can be in operation from 10AM to 6PM on Sundays. AWS to be sited 2 weeks prior to works commencing. | | | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | | | Current status: Planned work about to start | | | | Works reference: EC30034779191 | | |
|
|
| Thame Road, Haddenham, Buckinghamshire | | 30 April — 19 May | | | | Delays likely Traffic control (multi-way signals) | | | Works location: Approx 25M from j/o Aylesbury Road, Thame Road, Haddenham, Buckinghamshire. f\w. c\w. verge. | | | | Works description: Network Operations Distribution:Installation of new Low Voltage electricity cables to ensure safe and reliable power supplies:Excavation of trench in footway, verge & carriageway to enable the installation of a duct that will accommodate a low voltage cable. | | | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | | | Current status: Planned work about to start | | | | Works reference: EC30034779193 | | |
|
|
| A418 Oxford Road, Tiddington, Thame, Oxfordshire | | 01 May — 04 May | | | | Delays possible Some carriageway incursion | | | Works location: D'ACRE | | | | Works description: Reinstate verge in Verge. Our intention is to complete the PermanentReinstatement in the same phase | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031007435-001 | | |
|
|
| East Street, Thame, Oxfordshire | | 30 April — 03 May | | | | Delays unlikely Some carriageway incursion | | | Works location: 9 EAST STREET, THAME, OX9 3JS | | | | Works description: Service Pipe Repair <33mm Cway in Carriageway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031070306-001 | | |
|
|
| Hopton Road, Thame, Oxfordshire | | 30 April — 03 May | | | | Delays unlikely Some carriageway incursion | | | Works location: 14 HOPTON ROAD, THAME, OX9 3TS | | | | Works description: Service Pipe Repair <33mm Fway in Footway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031070499-001 | | |
|
|
| Hopton Road, Thame, Oxfordshire | | 30 April — 03 May | | | | Delays unlikely Some carriageway incursion | | | Works location: 22 HOPTON ROAD, THAME, OX9 3TS | | | | Works description: B Box Exchange <33mm Fway in Footway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031070431-001 | | |
|
|
| M40 | | 30 April — 01 May | | | | Delays unlikely Lane closure | | | Works location: Lane 1, J8 Exit A. Left Permanent Lane 1 Closed. | | | | Works description: M40 Northbound Lane Closure Junctions 8 Exit Slip Due to Construction - Improvements/ Upgrading Works. | | | | Responsibility for works: Highways England | | | | Current status: Planned work about to start | | | | Works reference: 50354 | | |
|
|
| M40 | | 01 May — 02 May | | | | Delays unlikely Lane closure | | | Works location: Lane 1, J8 Exit A. Left Permanent Lane 1 Closed. | | | | Works description: M40 Northbound Lane Closure Junctions 8 Exit Slip Due to Construction - Improvements/ Upgrading Works. | | | | Responsibility for works: Highways England | | | | Current status: Planned work about to start | | | | Works reference: 50354 | | |
|
|
| Moorend Lane, Thame, Oxfordshire | | 01 May — 04 May | | | | Delays unlikely Some carriageway incursion | | | Works location: MOOR END COTTAGE, MOOREND LANE, THAME, OX9 3B | | | | Works description: Service Pipe Repair <33mm Unmade in Verge. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031071257-001 | | |
|
|
| Road Running Through Moreton, Moreton, Thame, Oxfordshire | | 01 May — 02 May | | | | Delays unlikely Some carriageway incursion | | | Works location: Pole 25 at BETWEEN THE CEDAR AND CHILTERN VIEW. verge. | | | | Works description: Network Operations Distribution:Install / Replace / Remove overhead lines and poles:LV POLE REPLACEMENT | | | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | | | Current status: Planned work about to start | | | | Works reference: EC30034792163 | | |
|