A418 Oxford Road, Thame, Oxfordshire
28 November — 30 November
Delays likely Traffic control (two-way signals)
Works location: OS Bloor Homes Site. f\w.
Works description: Connections Highway Services:NEW INDIVIDUAL SUPPLY::New electrical connection to a feeder pillar
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034782286

M40
27 November — 28 November
Delays likely Some carriageway incursion
Works location: J8 exit J.
Works description: M40 Northbound Junction 8 Exit Slip Closure at Due to Carriageway Reconstruction / Repair Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20572

M40
27 November — 28 November
Delays likely Some carriageway incursion
Works location: J8 entry M.
Works description: M40 Southbound Junction 8 Entry Slip Closure at Due to Carriageway Reconstruction / Repair Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20579

M40
28 November — 29 November
Delays likely Some carriageway incursion
Works location: J6 entry A.
Works description: M40 Northbound Entry Slip Closure at Junction 6 Due to Carriageway Reconstruction / Repair Works
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20661

Rectory Road, Great Haseley, Oxford, Oxfordshire
27 November — 01 December
Delays likely Road closure
Works location: Land adj to 4 Rectory Road, Great Haseley, OX44 7JT
Works description: Plots 1-2: 2x32mm MDPE mtrd supplies in a shared trench. Plots 3-4:2x 32mm MDPE mtrd supplies in a shared trench. in Carriageway.
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU306000804424060045-001

B4009 Lower Icknield Way, Chinnor, Oxfordshire
27 November — 22 December
Delays possible Traffic control (multi-way signals)
Works location: From opp j/o Elderdene to j/o High Street, Lower Icknield Way, Chinnor, Oxfordshire. . c\w.
Works description: Network Operations Distribution:INSTALL 11KV HV CABLES:Excavation of trench in carriageway to enable the installation of a duct that will accommodate a high voltage cable.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034779752

B4009 Shirburn Road, Lewknor, Watlington, Oxfordshire
29 November — 01 December
Delays possible Traffic control (two-way signals)
Works location: OPP FIELD FARM HOUSE
Works description: Fire Hydrant Screw Dn Exchange Unmade in Verge. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030904348-004

B4009 Station Road, Chinnor, Oxfordshire
27 November — 15 December
Delays possible Traffic control (multi-way signals)
Works location: From electricity sub-station opp 8 to j/o Lower Road, Station Road. f\w. c\w.
Works description: Network Operations Distribution:INSTALL 11KV HV CABLES:Excavation of duct in carriageway to enable the installation of a duct that will accommodate a high voltage cable.
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034780520

B4012 Howland Road, Thame, Oxfordshire
27 November — 01 December
Delays possible Traffic control (multi-way signals)
Works location: (PCP21)JCN WENMAN ROAD,GARDEN CITY,CHINNOR ROAD, HOWLAND ROAD THAME, HOWLAND ROAD
Works description: TM PURPOSES ONLY
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005WP00400500247087503

B4012 Wenman Road, Thame, Oxfordshire
27 November — 01 December
Delays possible Traffic control (multi-way signals)
Works location: (PCP21) JCN CHINNOR ROAD,GARDEN CITY, HOWLAND ROAD, WEMAN ROAD THAME, WENMAN ROAD
Works description: TM PURPOSES ONLY
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005WP00400500247087502

B4012,B4445 Chinnor Road, Thame, Oxfordshire
27 November — 01 December
Delays possible Traffic control (multi-way signals)
Works location: (PCP21) OPPOSITE 20 ACROSS CARRIAGEWAY TO OUTSIDE 24 TO JUNCTION HOWLAND ROAD ON, CHINNOR ROAD
Works description: Install 37m of 1 way poly duct in Footway,Install 3m of 1 way poly duct in Verge,Install 8m of 1 way poly duct in Carriageway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005WP00400500247087501

M40
27 November — 28 November
Delays possible Lane closure
Works location: Lane 1 and Lane 2 Southbound M/P 77/7 - 76/6 B. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.
Works description: M40 Southbound Lane Closure Between Junction 8a and 7 Due to Carriageway Reconstruction / Repair Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20508

M40
27 November — 28 November
Delays possible Lane closure
Works location: Lane 1 and Lane 2 Northbound M/P 76/8 - 77/6 A. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.
Works description: M40 Northbound Lane Closure Between Junction 7 and 8 Due to Carriageway Reconstruction / Repair Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20498

M40
27 November — 28 November
Delays possible Lane closure
Works location: Hard shoulder, Lane 1 Southbound Closure M/P 72/6 - 72/0 B. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: M40 Southbound Lane Closures Between Junctions 7 and 6 Due to Barrier / Safety Fence Repair Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 21889

M40
27 November — 28 November
Delays possible Lane closure
Works location: Hard Shoulder & Lane 1 closures southbound M/P 77/6 - 76/3. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed.
Works description: M40 Southbound Lane Closures Between Junctions 8 and 7 Due to Barrier / Safety Fence Repair Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 23179

M40
28 November — 29 November
Delays possible Lane closure
Works location: Lane 1 and 2 Closure Northbound M/P 65/7 - 70/0. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed.
Works description: M40 Northbound Lane Closures at Junction 5 and 7 Due to Carriageway Repairs
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20646

Worminghall Road, Ickford, Buckinghamshire
28 November — 28 November
Delays possible Traffic control (two-way signals)
Works location: 34
Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030941939-001

Church Road, Thame, Oxfordshire
29 November — 01 December
Delays unlikely Some carriageway incursion
Works location: OPP. 2 CHURCH ROAD, THAME
Works description: Rein cobbles/blocks/kerb edgings in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030748438-005

Dollicott, Haddenham, Buckinghamshire
29 November — 08 December
Delays unlikely No carriageway incursion
Works location: Rear of No1, Dollicott . f\w. verge.
Works description: Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-600mm):diverting overhead line and installing new mains and services
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034782431

Kiln Avenue, Chinnor, Oxfordshire
29 November — 01 December
Delays unlikely Traffic control (priority working)
Works location: 21
Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030943556-001

M40
27 November — 28 November
Delays unlikely Some carriageway incursion
Works location: Diversion Northbound.
Works description: M40 Northbound Diversion from Junction 8 to Junction 8a and Follow A418 to A40 Due to Carriageway Reconstruction / R
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20638

M40
27 November — 28 November
Delays unlikely Some carriageway incursion
Works location: Diversion Southbound between Junctions 9 & 8a.
Works description: M40 Diversion Route Southbound from Junction 9 to 8a due to Resurfacing works off Network
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 19673

M40
28 November — 28 November
Delays unlikely Lane closure
Works location: Hard Shoulder Closed Northbound - 78/8 - 79/5 A. Left Hard Shoulder Closed.
Works description: M40 Northbound Hard Shoulder Closed Between Junction 8 and 8a due to Electrical Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 19939

M40
28 November — 29 November
Delays unlikely Lane closure
Works location: Diversion .
Works description: M40 Diversion Route Northbound from Junction 6 to Junction 7 and Return Southbound back to Junction 6
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 20657

M40
28 November — 29 November
Delays unlikely Some carriageway incursion
Works location: Diversion Southbound between Junctions 9 & 8a.
Works description: M40 Diversion Route Southbound from Junction 9 to 8a due to Resurfacing works off Network
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 19673

Rooks Lane, Thame, Oxfordshire
27 November — 01 December
Delays unlikely Traffic control (priority working)
Works location: Black Horse Inn
Works description: New gas service
Responsibility for works: STREET WORK LICENCES
Current status: Planned work about to start
Works reference: ZT905S50-759

Sheldon Road, Ickford, Buckinghamshire
27 November — 29 November
Delays unlikely Some carriageway incursion
Works location: 53
Works description: Boundary Box in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030952799-003

Thame Road, Great Milton, Oxford, Oxfordshire
29 November — 05 December
Delays unlikely Some carriageway incursion
Works location: OPPOSITE NUMBER 4
Works description: LAY NEW SERVICE FROM FARSIDE FOOTWAY TO SITE
Responsibility for works: SOUTHERN GAS NETWORKS PLC
Current status: Planned work about to start
Works reference: XW041W114734976-01542

Thame Hub Partners

banner
banner
banner
banner

Thame Hub Partners

banner
banner

Advertise with Us

banner

Upcoming Events

Oct
22
Thu
11:00 am Thame October Market @ Thame High Street
Thame October Market @ Thame High Street
Oct 22 @ 11:00 am – Oct 25 @ 4:00 pm
Thame October Market @ Thame High Street
Zoom Events' street market is returning to Thame High Street from Thursday, October 22nd to Sunday, October 25th, 2026. This event marks the second of two visits by Zoom Events to Thame in 2026. Described as a unique street market with a festival feel, the event will bring an eclectic mix of offerings to the centre of town, including street food, artisan groceries, arts, crafts, clothing, jewellery, and accessories. The event operating hours are scheduled as follows: Thursday, October 22: 11:00 AM – 5:00 PM Friday, October 23: 10:00 AM – 6:00 PM Saturday, October 24: 9:00 AM – 6:00 PM Sunday, October 25: 10:00 AM – 4:00 PM Opening times may vary slightly leading up to and during the event. For further details, inquiries…

Read More...

Oct
24
Sat
5:00 pm Thomley: Reduced Sound Firework ... @ Thomley,Worminghall
Thomley: Reduced Sound Firework ... @ Thomley,Worminghall
Oct 24 @ 5:00 pm – 8:00 pm
Thomley: Reduced Sound Firework Display 2026 @ Thomley,Worminghall
Join us at Thomley for our Reduced Sound Fireworks Display! Enjoy a spectacular evening of fireworks in a family-friendly and accessible setting. We have carefully selected fireworks that are amazing to watch while producing less noise than a traditional fireworks display, making them a great option for those who may find loud bangs overwhelming. There’ll be plenty to enjoy throughout the evening, including entertainment from our fire-breathing artist, a bar serving alcoholic and soft drinks, hot drinks to keep you warm, and a selection of hot food and treats available to purchase. Bring the whole family along, soak up the atmosphere and enjoy a fantastic evening of fireworks and entertainment at Thomley! 🎟️ BOOK TICKETS here. __PRESENT
Oct
27
Tue
11:00 am Haddenham Park Care Home: Stroke...
Haddenham Park Care Home: Stroke...
Oct 27 @ 11:00 am – 12:00 pm
Haddenham Park Care Home: Stroke UK Meet & Move
Join the Stroke UK Meet & Move monthly support group for stroke survivors and their caregivers. Hosted as part of the Stroke Association support network, each session offers helpful information, resources, and a welcoming community. Stroke survivors can take part in a 45–60 minute exercise class led by a qualified instructor, while caregivers can enjoy coffee and social time in the piano lounge and connect with others. When: Last Tuesday of every month, 11:00am–12:00pm (starting 28 July 2026)Where: Haddenham Park Care Home & Apartments, Tibbs Road, Haddenham, Buckinghamshire, HP17 8FH A supportive space to stay active, share experiences, and meet others affected by stroke.

Got a news story? Or do you want to reach out to the people of Thame?