| Roadworks |
| M40 | | 09 July — 10 July | | | | Delays likely Road closure | | | Works location: J7 Entry Closed. | | | | Works description: M40 Southbound Entry Closed at Junction 7 Due to Drainage Works. | | | | Responsibility for works: Highways England | | | | Current status: Planned work about to start | | | | Works reference: 16722 | | |
|
|
| M40 | | 10 July — 11 July | | | | Delays likely Road closure | | | Works location: Exit slip Closure Northbound at Junction 8. | | | | Works description: M40 Northbound Exit Slip Closure at Junction 8 onto Oxford Spur due to Drainage works | | | | Responsibility for works: HIGHWAYS ENGLAND | | | | Current status: Planned work about to start | | | | Works reference: 16771 | | |
|
|
| A418 Oxford Road, Thame, Oxfordshire | | 10 July — 13 July | | | | Delays possible Some carriageway incursion | | | Works location: 33 | | | | Works description: Reinstate verge in Verge. Our intention is to complete the PermanentReinstatement in the same phase | | | | Responsibility for works: UNKNOWN | | | | Current status: Planned work about to start | | | | Works reference: MU305000031074889-001 | | |
|
|
| A418 Scotsgrove Hill, Haddenham, Buckinghamshire | | 10 July — 17 July | | | | Delays possible Some carriageway incursion | | | Works location: Scotsgrove Hill | | | | Works description: Embargo | | | | Responsibility for works: Buckinghamshire | | | | Current status: Planned work about to start | | | | Works reference: BH001_35005906 | | |
|
|
| B4445 North Street, Thame, Oxfordshire | | 10 July — 13 July | | | | Delays possible Traffic control (multi-way signals) | | | Works location: 46 | | | | Works description: Washout Exchange 0 to 6" Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031083372-001 | | |
|
|
| M40 | | 09 July — 10 July | | | | Delays possible Lane closure | | | Works location: Lane 1 and 2 Closed - 74/9 - 76/6 A. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed. | | | | Works description: M40 Northbound Lane Closure Between Junction 6 and 8 due to Drainage Works. | | | | Responsibility for works: HIGHWAYS ENGLAND | | | | Current status: Planned work about to start | | | | Works reference: 16718 | | |
|
|
| M40 | | 09 July — 10 July | | | | Delays possible Lane closure | | | Works location: Lane 1 and 2 closed - 76/2 - 75/3 B. | | | | Works description: M40 Southbound Lane Closures Between Junction 8 and 6 due to Drainage Works. | | | | Responsibility for works: Highways England | | | | Current status: Planned work about to start | | | | Works reference: 16721 | | |
|
|
| M40 | | 10 July — 11 July | | | | Delays possible Lane closure | | | Works location: Lane 1 and 2 Closure, Southbound M/P 77/7 - 76/6. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed. | | | | Works description: M40 Southbound Lane Closures between Junctions 8a and 7 due to Drainage Works. | | | | Responsibility for works: HIGHWAYS ENGLAND | | | | Current status: Planned work about to start | | | | Works reference: 16742 | | |
|
|
| M40 | | 10 July — 11 July | | | | Delays possible Lane closure | | | Works location: Lane 1 and 2 Closure Northbound, Jct 7 - 8a, 76/8 - 78/0 A. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed. | | | | Works description: M40 Northbound Lane Closures between Junctions 7 and 8a due to Drainage Works. | | | | Responsibility for works: Highways England | | | | Current status: Planned work about to start | | | | Works reference: 16737 | | |
|
|
| Cromwell Avenue, Thame, Oxfordshire | | 09 July — 14 July | | | | Delays unlikely Traffic control (give & take) | | | Works location: (PCP13) SIDE OF 32 OVERTON DRIVE ON CROMWELL AVENUE | | | | Works description: Install cabinet and base, Install 1m of 2 poly ducts in Verge,Install 5m of 2 poly ducts in Footway, Install 1 of 1 way power duct in Verge,Install 1m of 1 way power duct in Footway,Performing an excavation to expose existing power cable in Footway | | | | Responsibility for works: Openreach | | | | Current status: Planned work about to start | | | | Works reference: BC006TI001MW500256546700 | | |
|
|
| M40 | | 10 July — 11 July | | | | Delays unlikely Some carriageway incursion | | | Works location: Diversion Northbound to Junction 8a and then A418 to A40 Wheatley. | | | | Works description: M40 Northbound Diversion to Junction 8a and then A418 to re-join A40 at Wheatley. | | | | Responsibility for works: Highways England | | | | Current status: Planned work about to start | | | | Works reference: 16898 | | |
|
|
| School Close, Ickford, Buckinghamshire | | 10 July — 13 July | | | | Delays unlikely Some carriageway incursion | | | Works location: 4 | | | | Works description: OSV Locate <33mm in Footway. Our intention is to complete thePermanent Reinstatement in the same phase | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000031101455-001 | | |
|