Roadworks around Thame w/c 03/09/2018
| Roadworks |
| B4012 Thame Park Road, Thame, Oxfordshire | | 03 September — 07 September | | | | Delays likely Traffic control (two-way signals) | | | Works location: from Highclear (P211) to (P204) greys mead. verge. | | | | Works description: Network Operations Distribution:Install / Replace / Remove overhead lines and poles:Pole Replacements | | | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | | | Current status: Planned work about to start | | | | Works reference: EC30034799742 | | |
|
|
| A418,B4445 Aylesbury Road, Thame, Oxfordshire | | 03 September — 14 September | | | | Delays possible Traffic control (multi-way signals) | | | Works location: ADJACENT TO THE THAM CRICKET CLUB | | | | Works description: LAYING A NEW GAS SUPPLY FROM FARSIDE FOOTWAY TO SITE | | | | Responsibility for works: SGN | | | | Current status: Planned work about to start | | | | Works reference: XW041W115489360-00050 | | |
|
|
| Pearce Way, Thame, Oxfordshire | | 03 September — 06 September | | | | Delays unlikely No carriageway incursion | | | Works location: 34-36 | | | | Works description: METER INSTALLATION IN FOOTWAY | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU039NOT-198299 | | |
|
|
| Webster Close, Thame, Oxfordshire | | 03 September — 06 September | | | | Delays unlikely No carriageway incursion | | | Works location: 24-26 | | | | Works description: METER INSTALLATION IN FOOTWAY | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU039NOT-198302 | | |
|