| A418 Oxford Road, Thame, Oxfordshire | | 28 November — 30 November | | Delays likely Traffic control (two-way signals) | | Works location: OS Bloor Homes Site. f\w. | | Works description: Connections Highway Services:NEW INDIVIDUAL SUPPLY::New electrical connection to a feeder pillar | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | Current status: Planned work about to start | | Works reference: EC30034782286 |
|
|
| M40 | | 27 November — 28 November | | Delays likely Some carriageway incursion | | Works location: J8 exit J. | | Works description: M40 Northbound Junction 8 Exit Slip Closure at Due to Carriageway Reconstruction / Repair Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20572 |
|
|
| M40 | | 27 November — 28 November | | Delays likely Some carriageway incursion | | Works location: J8 entry M. | | Works description: M40 Southbound Junction 8 Entry Slip Closure at Due to Carriageway Reconstruction / Repair Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20579 |
|
|
| M40 | | 28 November — 29 November | | Delays likely Some carriageway incursion | | Works location: J6 entry A. | | Works description: M40 Northbound Entry Slip Closure at Junction 6 Due to Carriageway Reconstruction / Repair Works | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20661 |
|
|
| Rectory Road, Great Haseley, Oxford, Oxfordshire | | 27 November — 01 December | | Delays likely Road closure | | Works location: Land adj to 4 Rectory Road, Great Haseley, OX44 7JT | | Works description: Plots 1-2: 2x32mm MDPE mtrd supplies in a shared trench. Plots 3-4:2x 32mm MDPE mtrd supplies in a shared trench. in Carriageway. | | Responsibility for works: THAMES WATER | | Current status: Planned work about to start | | Works reference: MU306000804424060045-001 |
|
|
| B4009 Lower Icknield Way, Chinnor, Oxfordshire | | 27 November — 22 December | | Delays possible Traffic control (multi-way signals) | | Works location: From opp j/o Elderdene to j/o High Street, Lower Icknield Way, Chinnor, Oxfordshire. . c\w. | | Works description: Network Operations Distribution:INSTALL 11KV HV CABLES:Excavation of trench in carriageway to enable the installation of a duct that will accommodate a high voltage cable. | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | Current status: Planned work about to start | | Works reference: EC30034779752 |
|
|
| B4009 Shirburn Road, Lewknor, Watlington, Oxfordshire | | 29 November — 01 December | | Delays possible Traffic control (two-way signals) | | Works location: OPP FIELD FARM HOUSE | | Works description: Fire Hydrant Screw Dn Exchange Unmade in Verge. Our intention is tocomplete the Permanent Reinstatement in the same phase | | Responsibility for works: THAMES WATER | | Current status: Planned work about to start | | Works reference: MU305000030904348-004 |
|
|
| B4009 Station Road, Chinnor, Oxfordshire | | 27 November — 15 December | | Delays possible Traffic control (multi-way signals) | | Works location: From electricity sub-station opp 8 to j/o Lower Road, Station Road. f\w. c\w. | | Works description: Network Operations Distribution:INSTALL 11KV HV CABLES:Excavation of duct in carriageway to enable the installation of a duct that will accommodate a high voltage cable. | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | Current status: Planned work about to start | | Works reference: EC30034780520 |
|
|
| B4012 Howland Road, Thame, Oxfordshire | | 27 November — 01 December | | Delays possible Traffic control (multi-way signals) | | Works location: (PCP21)JCN WENMAN ROAD,GARDEN CITY,CHINNOR ROAD, HOWLAND ROAD THAME, HOWLAND ROAD | | Works description: TM PURPOSES ONLY | | Responsibility for works: Openreach | | Current status: Planned work about to start | | Works reference: BC005WP00400500247087503 |
|
|
| B4012 Wenman Road, Thame, Oxfordshire | | 27 November — 01 December | | Delays possible Traffic control (multi-way signals) | | Works location: (PCP21) JCN CHINNOR ROAD,GARDEN CITY, HOWLAND ROAD, WEMAN ROAD THAME, WENMAN ROAD | | Works description: TM PURPOSES ONLY | | Responsibility for works: Openreach | | Current status: Planned work about to start | | Works reference: BC005WP00400500247087502 |
|
|
| B4012,B4445 Chinnor Road, Thame, Oxfordshire | | 27 November — 01 December | | Delays possible Traffic control (multi-way signals) | | Works location: (PCP21) OPPOSITE 20 ACROSS CARRIAGEWAY TO OUTSIDE 24 TO JUNCTION HOWLAND ROAD ON, CHINNOR ROAD | | Works description: Install 37m of 1 way poly duct in Footway,Install 3m of 1 way poly duct in Verge,Install 8m of 1 way poly duct in Carriageway | | Responsibility for works: Openreach | | Current status: Planned work about to start | | Works reference: BC005WP00400500247087501 |
|
|
| M40 | | 27 November — 28 November | | Delays possible Lane closure | | Works location: Lane 1 and Lane 2 Southbound M/P 77/7 - 76/6 B. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed. | | Works description: M40 Southbound Lane Closure Between Junction 8a and 7 Due to Carriageway Reconstruction / Repair Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20508 |
|
|
| M40 | | 27 November — 28 November | | Delays possible Lane closure | | Works location: Lane 1 and Lane 2 Northbound M/P 76/8 - 77/6 A. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed. | | Works description: M40 Northbound Lane Closure Between Junction 7 and 8 Due to Carriageway Reconstruction / Repair Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20498 |
|
|
| M40 | | 27 November — 28 November | | Delays possible Lane closure | | Works location: Hard shoulder, Lane 1 Southbound Closure M/P 72/6 - 72/0 B. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed. | | Works description: M40 Southbound Lane Closures Between Junctions 7 and 6 Due to Barrier / Safety Fence Repair Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 21889 |
|
|
| M40 | | 27 November — 28 November | | Delays possible Lane closure | | Works location: Hard Shoulder & Lane 1 closures southbound M/P 77/6 - 76/3. Left Hard Shoulder Closed.Left Permanent Lane 1 Closed. | | Works description: M40 Southbound Lane Closures Between Junctions 8 and 7 Due to Barrier / Safety Fence Repair Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 23179 |
|
|
| M40 | | 28 November — 29 November | | Delays possible Lane closure | | Works location: Lane 1 and 2 Closure Northbound M/P 65/7 - 70/0. Left Permanent Lane 1 Closed.Left Permanent Lane 2 Closed. | | Works description: M40 Northbound Lane Closures at Junction 5 and 7 Due to Carriageway Repairs | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20646 |
|
|
| Worminghall Road, Ickford, Buckinghamshire | | 28 November — 28 November | | Delays possible Traffic control (two-way signals) | | Works location: 34 | | Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase | | Responsibility for works: THAMES WATER | | Current status: Planned work about to start | | Works reference: MU305000030941939-001 |
|
|
| Church Road, Thame, Oxfordshire | | 29 November — 01 December | | Delays unlikely Some carriageway incursion | | Works location: OPP. 2 CHURCH ROAD, THAME | | Works description: Rein cobbles/blocks/kerb edgings in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase | | Responsibility for works: THAMES WATER | | Current status: Planned work about to start | | Works reference: MU305000030748438-005 |
|
|
| Dollicott, Haddenham, Buckinghamshire | | 29 November — 08 December | | Delays unlikely No carriageway incursion | | Works location: Rear of No1, Dollicott . f\w. verge. | | Works description: Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-600mm):diverting overhead line and installing new mains and services | | Responsibility for works: UK POWER NETWORKS EASTERN & LONDON | | Current status: Planned work about to start | | Works reference: EC30034782431 |
|
|
| Kiln Avenue, Chinnor, Oxfordshire | | 29 November — 01 December | | Delays unlikely Traffic control (priority working) | | Works location: 21 | | Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase | | Responsibility for works: THAMES WATER | | Current status: Planned work about to start | | Works reference: MU305000030943556-001 |
|
|
| M40 | | 27 November — 28 November | | Delays unlikely Some carriageway incursion | | Works location: Diversion Northbound. | | Works description: M40 Northbound Diversion from Junction 8 to Junction 8a and Follow A418 to A40 Due to Carriageway Reconstruction / R | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20638 |
|
|
| M40 | | 27 November — 28 November | | Delays unlikely Some carriageway incursion | | Works location: Diversion Southbound between Junctions 9 & 8a. | | Works description: M40 Diversion Route Southbound from Junction 9 to 8a due to Resurfacing works off Network | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 19673 |
|
|
| M40 | | 28 November — 28 November | | Delays unlikely Lane closure | | Works location: Hard Shoulder Closed Northbound - 78/8 - 79/5 A. Left Hard Shoulder Closed. | | Works description: M40 Northbound Hard Shoulder Closed Between Junction 8 and 8a due to Electrical Works. | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 19939 |
|
|
| M40 | | 28 November — 29 November | | Delays unlikely Lane closure | | Works location: Diversion . | | Works description: M40 Diversion Route Northbound from Junction 6 to Junction 7 and Return Southbound back to Junction 6 | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 20657 |
|
|
| M40 | | 28 November — 29 November | | Delays unlikely Some carriageway incursion | | Works location: Diversion Southbound between Junctions 9 & 8a. | | Works description: M40 Diversion Route Southbound from Junction 9 to 8a due to Resurfacing works off Network | | Responsibility for works: Highways England | | Current status: Planned work about to start | | Works reference: 19673 |
|
|
| Rooks Lane, Thame, Oxfordshire | | 27 November — 01 December | | Delays unlikely Traffic control (priority working) | | Works location: Black Horse Inn | | Works description: New gas service | | Responsibility for works: STREET WORK LICENCES | | Current status: Planned work about to start | | Works reference: ZT905S50-759 |
|
|
| Sheldon Road, Ickford, Buckinghamshire | | 27 November — 29 November | | Delays unlikely Some carriageway incursion | | Works location: 53 | | Works description: Boundary Box in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase | | Responsibility for works: THAMES WATER | | Current status: Planned work about to start | | Works reference: MU305000030952799-003 |
|
|
| Thame Road, Great Milton, Oxford, Oxfordshire | | 29 November — 05 December | | Delays unlikely Some carriageway incursion | | Works location: OPPOSITE NUMBER 4 | | Works description: LAY NEW SERVICE FROM FARSIDE FOOTWAY TO SITE | | Responsibility for works: SOUTHERN GAS NETWORKS PLC | | Current status: Planned work about to start | | Works reference: XW041W114734976-01542 |
|