| The Vines, Shabbington, Buckinghamshire | | 02 November — 08 November | | | | Delays possible Traffic control (two-way signals) | | | Works location: The Vine, The Vines, Shabbington, Aylesbury, Bucks, HP18 9HH | | | | Works description: Plots 1-2: 2x32mm MDPE mtrd supplies in a shared trench Plot 3: 1x32mmMDPE mtrd water supply in Carriageway. | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU306000805858270045-001 | | |
|
|
| B4445 Park Street, Thame, Oxfordshire | | 04 November — 08 November | | | | Delays unlikely Traffic control (priority working) | | | Works location: 87 | | | | Works description: Reinstate carriageway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000030889164-002 | | |
|
|
| High Street, Thame, Oxfordshire | | 03 November — 07 November | | | | Delays unlikely Some carriageway incursion | | | Works location: 10 THE OLD MALTINGS | | | | Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU358001238KKRZ--000001 | | |
|
|
| Marston Road, Thame, Oxfordshire | | 03 November — 07 November | | | | Delays unlikely Some carriageway incursion | | | Works location: 12 | | | | Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMEN--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU358001238KKCM--000001 | | |
|
|
| Moats Crescent, Thame, Oxfordshire | | 03 November — 09 November | | | | Delays unlikely Some carriageway incursion | | | Works location: OPPOSITE NEW BUILDS REAR OF 2 MOATS CRESCENT | | | | Works description: LAY NEW SERVICES 11M FROM FARSIDE FOOTWAY TO SITE | | | | Responsibility for works: SOUTHERN GAS NETWORKS PLC | | | | Current status: Planned work about to start | | | | Works reference: XW041W114664567-07644 | | |
|
|
| North Close, Tiddington, Thame, Oxfordshire | | 03 November — 03 November | | | | Delays unlikely Some carriageway incursion | | | Works location: 2 | | | | Works description: PERMANENT REINSTATEMENT TO BE COMPLETED | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000030927101-001 | | |
|
|
|
| Wykeham Rise, Chinnor, Oxfordshire | | 04 November — 08 November | | | | Delays unlikely Some carriageway incursion | | | Works location: 15 | | | | Works description: Reinstate multiple surfaces in Carriageway. Our intention is to completethe Permanent Reinstatement in the same phase | | | | Responsibility for works: THAMES WATER | | | | Current status: Planned work about to start | | | | Works reference: MU305000030865231-002 | | |
|