Chinnor Road, Bledlow
16 March — 20 March
Delays likely Traffic control (two-way signals)
Works location: Junction On West Lane And Dwn Skittle Green
Works description: -
Responsibility for works: Buckinghamshire County Council
________________________________________
Thame Road, Long Crendon
16 March — 17 March
Delays likely Traffic control (multi-way signals)
Works location: B4011 Thame Road At Jcn With Drakes Drive Long Crendon Aylsbury Hp199be
Works description: -
Responsibility for works: BT
________________________________________
Chearsley Road, Long Crendon
17 March — 21 March
Delays possible Traffic control (two-way signals)
Works location: 42
Works description: -
Responsibility for works: Thames Water
________________________________________
Churchway, Haddenham
17 March — 23 March
Delays possible Some carriageway incursion
Works location: 42a, Churchway, Haddenham, Aylesbury, Hp17 8he
Works description: -
Responsibility for works: Thames Water
________________________________________
Station Road, Chinnor
17 March — 22 March
Delays possible Traffic control (two-way signals)
Works location: Outside 38
Works description: Lay New Service 4m Nearside Carriageway Works Up To Footway To Be Done 17/03/17 Lights To Be Used For Carriageway 20/03/17
Responsibility for works: SGN
________________________________________
Thame Road, Chinnor
17 March — 21 March
Delays possible Traffic control (two-way signals)
Works location: O/S 4/8 Crossing Cw To Opposite Side On Thame Road, Thame Road
Works description: Install 10m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
________________________________________
Crabtree Road, Haddenham
17 March — 21 March
Delays unlikely Traffic control (give & take)
Works location: 27m South To 5m East Of Jnc Stockwell On , Crabtree Road
Works description: -
Responsibility for works: BT
________________________________________
Golden Hills, Chinnor, Oxfordshire
16 March — 20 March
Delays unlikely Some carriageway incursion
Works location: 10 Golden Hills Chinnor Ox39 4pt
Works description: Fire Hydrant Standard Repair In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Hill Top Lane, Chinnor
16 March — 20 March
Delays unlikely Some carriageway incursion
Works location: Highacres
Works description: Reinstate Multiple Surfaces In Carriageway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Lower Icknield Way, Chinnor
17 March — 21 March
Delays unlikely Some carriageway incursion
Works location: 12
Works description: Service Pipe Repair <33mm No Excav In Verge. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Oak End Way, Chinnor
16 March — 20 March
Delays unlikely Some carriageway incursion
Works location: 24
Works description: Reinstate Footway In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Stockwell, Haddenham
17 March — 21 March
Delays unlikely Traffic control (give & take)
Works location: 6m North East To 14m North Of Jnc Crabtree Road On, Stockwell
Works description: -
Responsibility for works: BT
________________________________________
The Croft, Haddenham
17 March — 21 March
Delays unlikely Traffic control (give & take)
Works location: 33m To 27m South Of Jnc Stockwell On, The Croft
Works description: -
Responsibility for works: BT
________________________________________
The Gables, Haddenham
16 March — 20 March
Delays unlikely Some carriageway incursion
Works location: O/S No 1, The Gables
Works description: -
Responsibility for works: BT














