09 January — 11 January
Delays likely Traffic control (Stop/Go boards)
Works location: From House of Spice to shops
Works description: Order raised for High Pressure Jetting of system Bucks page 127 grid A6 Stop and go (HW DRAINAGE CLEARANCE MANUAL/M)
Responsibility for works: Buckinghamshire
Current status: Planned work about to start
Works reference: BH0025047963
Station Road, Haddenham, Buckinghamshire
08 January — 02 February
Delays likely Road closure
Works location: FROM THE JUNCTION OF FLINT STREET TO JUNCTION OF GIBSON LANE
Works description: WORKING ON BEHALF OF THAMES WATER - WORKS METHODOLOGY - 115M OF D/DRILL , 10 X SERVICE RELAYS / CONNECTIONS AND DISCONNECTIONS SURFACE LOCATION CW AND FW
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU823C956/MASN01/C007
A418 Oxford Road, Thame, Oxfordshire
10 January — 12 January
Delays possible Some carriageway incursion
Works location: OPPOSITE NUMBER 9
Works description: Reinstate footway in Footway. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030952808-003
B4012,B4445 Chinnor Road, Thame, Oxfordshire
09 January — 09 January
Delays possible Traffic control (two-way signals)
Works location: 2 WAY LIGHTS REQUIRED FOR 1 DAY 0930-1530HRS TO ENABLE SAFE ACCESS TO REPAIR DAMAGED OVERHEAD CABLE
Works description: 2 WAY LIGHTS REQUIRED FOR 1 DAY 0930-1530HRS TO ENABLE SAFE ACCESS TO REPAIR DAMAGED OVERHEAD CABLE
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005CR4W000LUXCV346441A
Chearsley Road, Long Crendon, Buckinghamshire
09 January — 09 January
Delays possible Traffic control (two-way signals)
Works location: 116m jct w/ High Street
Works description: Non excavation. 2 way lights to be installed around cherry picker for telecoms mast maintenance works.
Responsibility for works: T-MOBILE (UK)LIMITED
Current status: Planned work about to start
Works reference: YN10019748-BAB-RTS-CW
M40
09 January — 10 January
Delays possible Lane closure
Works location: Lane 2 and 3 Closure, Northbound M/P 77/7 - 78/4 A. Left Permanent Lane 2 Closed.Left Permanent Lane 3 Closed.
Works description: M40 Northbound Lane Closures Between Junctions 8 and 8a Due to Electrical Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 28340
M40
09 January — 10 January
Delays possible Lane closure
Works location: Lane 2 and 3 Closure, Southbound Jct 8a - Jct 8, 80/2 - 78/0 B. Left Permanent Lane 2 Closed.Left Permanent Lane 3 Closed.
Works description: M40 Southbound Lane Closures Between Junctions 8a and 8 Due to Electrical Works.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 28416
Mill Lane, Chinnor, Oxfordshire
08 January — 19 January
Delays possible Traffic control (two-way signals)
Works location: J/o Station Road to o/s 3 Mill Lane
Works description: 1 x LV link box and LV connection for new development
Responsibility for works: GAS TRANSPORTATION CO LTD
Current status: Planned work about to start
Works reference: ZP011P79075N0017614/R1
Brookstones, Sydenham, Chinnor, Oxfordshire
10 January — 12 January
Delays unlikely Some carriageway incursion
Works location: BROOKSTONES
Works description: Reinstate verge in Verge. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030995092-001
Church Road, Chinnor, Oxfordshire
08 January — 26 January
Delays unlikely Some carriageway incursion
Works location: At Station Road and Church Lane
Works description: Section 278 works
Responsibility for works: STREET WORK LICENCES
Current status: Advanced planning
Works reference: ZT905P6160
Greenwood Meadow, Chinnor, Oxfordshire
08 January — 26 January
Delays unlikely Some carriageway incursion
Works location: Glynwood and Oak End Way
Works description: Section 278 works
Responsibility for works: STREET WORK LICENCES
Current status: Advanced planning
Works reference: ZT905P6163
Moats Crescent, Thame, Oxfordshire
08 January — 10 January
Delays unlikely Some carriageway incursion
Works location: plot 1,1-2 moats crescent
Works description: Reinstate footway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU306000805247320125-001
Nelson Street, Thame, Oxfordshire
10 January — 12 January
Delays unlikely Some carriageway incursion
Works location: 31
Works description: REPAIR LEAK IN FOOTWAY--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU358001238KQBG--000002
Pegasus Way, Haddenham, Buckinghamshire
08 January — 19 January
Delays unlikely No carriageway incursion
Works location: outside of link road s/s and the new cala homes development site. f\w. verge.
Works description: Connections Projects:NEW SUPPLY SCHEME: (APPROX DEPTH 450mm-600mm):installation of new LV mains to the Cala Homes site
Responsibility for works: UK POWER NETWORKS EASTERN & LONDON
Current status: Planned work about to start
Works reference: EC30034784769
Pegasus Way, Haddenham, Buckinghamshire
09 January — 15 January
Delays unlikely Some carriageway incursion
Works location: 299M TO 316M NORTH EAST OF JCN MILLWAY FURLONG ON, PEGASUS WAY
Works description: 1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Demolish 1 existing jointbox(s) or cabinet base(s),Excavate 2m3 to a depth of up to 700mm to allow for duct repositioning in Footway,Reinstate 2m3 following excavation in Carriageway,Reinstate 3m2 following excavation in Carriageway,Reposition 9m of 1 way poly duct
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006CT001LC500249811303
Road Running Through Henton, Henton, Chinnor, Oxfordshire
10 January — 12 January
Delays unlikely Some carriageway incursion
Works location: Peckspool Cottage
Works description: Reinstate verge in Verge. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU305000030996015-001
Sheerstock, Haddenham, Buckinghamshire
08 January — 10 January
Delays unlikely No carriageway incursion
Works location: 26
Works description: WATER METER INSTALLATION IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-180631-01

Please 'Follow' & 'Like' Thame Hub

Thame Hub Partners

banner
banner
banner
banner

Thame Hub Partners

banner
banner

Advertise with Us

banner

Upcoming Events

Aug
3
Mon
11:00 am Haddenham Park Care Home: Parkin... @ Haddeham Park Care Home
Haddenham Park Care Home: Parkin... @ Haddeham Park Care Home
Aug 3 @ 11:00 am – 12:00 pm
Haddenham Park Care Home: Parkinson's Support Group And Exercise Classs @ Haddeham Park Care Home
Join this free monthly support group for people living with Parkinson's and their caregivers. Held on the first Monday of every month from 11:00am–12:00pm, the session includes a gentle, physiotherapist-led exercise class for participants with Parkinson's, while caregivers can enjoy coffee, cake and the opportunity to connect with others in a relaxed, supportive environment. When: First Monday of every month, 11:00am–12:00pmCost: FreeWho: People living with Parkinson's and their caregivers
Aug
6
Thu
2:00 pm Family Beach Day at Haddenham Park!
Family Beach Day at Haddenham Park!
Aug 6 @ 2:00 pm – 6:00 pm
Family Beach Day at Haddenham Park!
Bringing the Seaside to Haddenham Park Location : Haddenham Park Care Home Thursday 6 August 2026 2:00pm – 6:00pm Get ready for an afternoon of seaside fun as we bring the spirit of the coast to Haddenham Park for our very own Family Beach Day! We’re inviting our residents, families, and members of the local community to join us for a fun-filled summer afternoon featuring: Live steel pan music Food Beach fun and plenty more! Come along, enjoy the atmosphere and help us create some wonderful summer memories together. Beach-themed attire is encouraged, so grab your sun hats, Hawaiian shirts and seaside accessories! __PRESENT __PRESENT
Aug
17
Mon
7:30 pm Death Cafe @ Thame Barns Centre
Death Cafe @ Thame Barns Centre
Aug 17 @ 7:30 pm – 8:30 pm
Death Cafe @ Thame Barns Centre
You are warmly invited to attend Death Cafe in Thame. at 7:30pm in room 1 of the Barns Centre, and held on the third Thursday of each month thereafter A Death Cafe is an informal gathering where people can discuss death over tea and cake. We’re aiming to normalise the topic of death, raise acceptance, and help people make the most of their lives by breaking the taboo around mortality. It is not a grief support group or counselling session. These sessions have no agenda, objectives, or themes, allowing for organic, group-directed conversations about anything related to death, from end-of-life planning to fears and feelings, fostering open sharing in a respectful, confidential space. Death Cafe is run on a not-for-profit basis but if you are able to make…

Read More...

Got a news story? Or do you want to reach out to the people of Thame?