Fort End, Haddenham
10 August — 14 August
Delays possible Some carriageway incursion Works location: 17
Responsibility for works: Thames Water
________________________________________
Elderdene, Chinnor
10 August — 14 August
Delays unlikely Some carriageway incursion Works location: 6 Works description: Reinstate Footway In Footway. Our Intention Is To Complete The Permanent reinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Highfield, Long Crendon
10 August — 14 August
Delays unlikely Some carriageway incursion Works location: 6 Highfield, Aylesbury, Hp18 9dr
Responsibility for works: Thames Water Current status: Planned work about to start
________________________________________
Marston Road, Thame
11 August — 14 August
Delays unlikely No carriageway incursion Works location: Os 35 In Footpath. F\W.
Works description: Connections Small Service:New Service: (Approx Depth 450mm-600mm):Interim - Perm Reinstatement - Dig Out Tarmac And Replace Low Level Concrete
Responsibility for works: UK Power Networks
________________________________________
Park Lane, Kingston Blount
10 August — 14 August
Delays unlikely Some carriageway incursion Works location: 4 Park Lane, Kingston Bloint, Ox39 4sl
Works description: Service Pipe Repair <33mm Cway In Carriageway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Sheldon Road, Ickford
11 August — 15 August
Delays unlikely Some carriageway incursion Works location: 67
Responsibility for works: Thames Water
________________________________________
Sydenham Road, Sydenham, Chinnor
11 August — 15 August
Delays unlikely Some carriageway incursion Works location: 2 And 3 Works description: Boundary Box Exchange Cway In Private - Made. Our Intention Is To complete The Permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water
________________________________________
Westfield Road, Long Crendon
10 August — 14 August
Delays unlikely Some carriageway incursion Works location: Opp Baileys Farm, Westfield Road, Long Crendon, Aylesbury, Hp18 9en
Responsibility for works: Thames Water C
________________________________________
B4445 Park Street, Thame
12 August — 16 August
Delays unlikely Traffic control (priority working) Works location: Opp 49a Park Street Thame
Works description: Main Clamp 0 To 6" Cway In Carriageway. Our Intention Is To Complete The permanent Reinstatement In The Same Phase
Responsibility for works: Thames Water