Menu

Oxfordshire increasing number of crews repairing potholes following cold snap

6th February 2026

Additional teams and resources are being made available to repair potholes on Oxfordshire’s roads following a rise in reports of defects due to recent wet and freezing conditions.

Oxfordshire County Council and its principal highways contractor M Group are more than doubling the number of repair crews from seven to at least 16 to reduce a backlog of potholes caused by the weather.

Heavy rainfall and then colder weather from mid-December into January created a cycle of freezing and thawing – perfect conditions for creating new potholes.

The council aims to repair potholes within two hours, 24 hours or 28 days, depending on how big a risk they pose. About 875 of the 28 day jobs – around 35 per cent of the total – missed their deadlines by a few days because of the rise in reports at the beginning of January and other priority issues.

Crews have also faced many larger potholes, requiring substantial repair methods which – although producing high quality results – are more labour intensive and time consuming and reduce the number of defects that can be fixed in a day.

Councillor Andrew Gant, Oxfordshire County Council’s Cabinet Member for Transport Management, said: “It has been a difficult winter, but we are actively looking to improve the situation on our roads by making more resources available to repair potholes as quickly as possible.

“Our highways teams work very hard in all weathers and conditions to maintain the 3,000 miles of road for which we are responsible. We know how important the condition of our highways is for our residents, which is why we are taking positive action.”

Repair methods include two-person gangs cutting out and replacing the defective carriageway; a Dragon Patcher machine, which seals repairs with stone chippings and hot bitumen emulsion; and Bobcat machines, which can remove large areas of damaged road surface in minutes.

To reduce the number of outstanding repairs, the council and M Group are employing more sub-contractors, redirecting the Dragon Patcher to tackle safety defects full time, retaining the Bobcat crews for defect repairs rather than scheduled maintenance, and redeploying crews to where they are most needed.

More than 41,000 highways defects were reported to the council in the last 12 months, around 90 per cent of which were potholes. About a quarter of these were reported by members of the public through the council’s Fix My Street portal, with the rest logged during its own highway inspections.

Crews are also empowered to repair additional issues, which they spot while carrying out their instructions.

To ensure quality and consistency, 20 per cent of completed repairs are inspected to assess the completeness and workmanship.

The vast majority (97 per cent) of Oxfordshire’s pothole repairs are now cut square, joint sealed filled and compacted, to undertake a permanent fix first time. Contractors filled 37,042 potholes in 2024 - 25.

Members of the public are encouraged to report potholes using www.fixmystreet.com, preferably with photographs if it is safe to take one. Fix My Street reports are generally investigated within 10 days of being raised.

People can also log on to Oxfordshire County Council’s website oxfordshire.gov.uk to report potholes.

While reactive highway work is vital, particularly for potholes that cause an immediate danger, the council’s emphasis is on maintenance work to prevent potholes forming in the first place, which is much more cost-effective than repairing them afterwards.

It has invested nearly £14.5 million since 2024 on its largest surface dressing programmes for at least 20 years, treating around two million square metres of carriageway.

Richard Lovewell, M Group Business Director, said: “We’re working closely with Oxfordshire County Council to respond to the leap in pothole reports over recent weeks. We’ve brought in additional resource and are currently working to bring in even more gangs whilst proposing initiatives including Bobcat and Dragon Patcher repairs.

“Potholes are frustrating for us all, but please remember the crews working hard to repair our roads at all hours and in all conditions should be treated with respect.”

In recent years there has been a rise in reported incidents of abuse and threatening behaviour, including filming operatives as they work to post on social media, with a minority of motorists or residents taking their frustration out on roadworkers over delays as improvements are made to the network.

Please 'Follow' & 'Like' Thame Hub

Thame Hub Partners

banner
banner
banner
banner

Thame Hub Partners

banner

Advertise with Us

banner

Upcoming Events

Jun
6
Sat
10:00 am Thame Plant-Based Market @ High Street, Thame
Thame Plant-Based Market @ High Street, Thame
Jun 6 @ 10:00 am – 4:00 pm
Thame Plant-Based Market @ High Street, Thame
Discover a mouth-watering selection of hot food, refreshing drinks, artisan deli delights, and handcrafted treasures. Whether you’re vegan, curious or simply love exploring fresh flavours and creativity, our market has something for everyone to enjoy!
Jun
18
Thu
7:30 pm Death Cafe @ Thame Barns Centre
Death Cafe @ Thame Barns Centre
Jun 18 @ 7:30 pm – 8:30 pm
Death Cafe @ Thame Barns Centre
You are warmly invited to attend Death Cafe in Thame. at 7:30pm in room 1 of the Barns Centre, and held on the third Thursday of each month thereafter A Death Cafe is an informal gathering where people can discuss death over tea and cake. We’re aiming to normalise the topic of death, raise acceptance, and help people make the most of their lives by breaking the taboo around mortality. It is not a grief support group or counselling session. These sessions have no agenda, objectives, or themes, allowing for organic, group-directed conversations about anything related to death, from end-of-life planning to fears and feelings, fostering open sharing in a respectful, confidential space. Death Cafe is run on a not-for-profit basis but if you are able to make…

Read More...

Jun
21
Sun
10:30 am Thame Duck Race 2026 @ Old Long Crendon Rd Bridge, River Thame, Priest End
Thame Duck Race 2026 @ Old Long Crendon Rd Bridge, River Thame, Priest End
Jun 21 @ 10:30 am – 11:30 am
Thame Duck Race 2026 @ Old Long Crendon Rd Bridge, River Thame, Priest End
Quack Quack IT'S BACK! Join Thame Round Table for their most quackers event of the year, the Thame Round Table annual DUCK RACE returns on Sunday, 21st June 2026! Get your digital tickets on sale NOW: https://trt.fyi/duckrace EARLYDUCK discounts available, catch them before they fly! Prizes for 1st, 2nd, and 3rd place Race Start @11am (gates open from 10.30am) Old Long Crendon Rd Bridge, River Thame, Priest End what3words: w3w.co/adopting.tape.songbird

Got a news story? Or do you want to reach out to the people of Thame?